Simply put, BIM’s promise to accommodate design changes in real time can be stymied by static and outdated product information, which can lead to hours of unnecessary research for engineers and backtracking and redrawing for building modelers. The problem is that BIM software, such as the industry-leading Revit from Autodesk, may provide a great framework for building out complex 3D representations of building systems, but it often lacks the product libraries crucial to a complete and accurate building information modeling. Unfortunately, reality has fallen short of this goal for many electrical engineers and modelers. This new approach has promised to turn building plans into virtual libraries of equipment data and requirements – including, for example, product specifications, electrical connections and clearance requirements. The move from computer-aided design (CAD) to building-information modeling (BIM) has been heralded as an evolutionary advancement in building-design technology.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |